Bathroom Remodeling · Highland, CA
NEW BATHROOM. DONE RIGHT.
Design, plumbing, tile, permits, all in one crew.
Bathroom remodeling in Highland and the Inland Empire with clean plumbing, quality tile, and honest timelines.
FULL DESIGN HELP
PERMITS PULLED
FLAT PRICING
ON-TIME BUILDS
Why Choose Us
REMODELS WITHOUT THE CHAOS
A bath remodel touches plumbing, tile, electric, and drywall. We manage all of it so you're not chasing five different guys.
Real design help
We'll help you pick tile, vanities, valves, and layouts that fit your space and budget. No spinning through Pinterest alone.
Plumbing done to code
Because we're a plumbing company first, the pipes behind the tile get done right. Proper venting, right slope on drains, and clean supply runs.
Permits and inspections
Highland requires permits for most remodels. We pull them, schedule the inspector, and keep everything on file for your records.
One crew, one point of contact
Demo, plumbing, tile, drywall, paint, and finish are handled by our team. You call one person for updates, not five.
Customer Reviews
REMODELS THEY LOVE
From the crew
WHAT A GOOD BATHROOM REMODEL IN HIGHLAND, CA LOOKS LIKE
A bathroom remodel in Highland, CA can be one of the best upgrades you make to a home. It's the room you start and end every day in, and small changes to layout, lighting, and fixtures make a huge difference in how the whole house feels. It's also one of the easiest projects to get wrong when the crew doesn't understand plumbing, so we approach every remodel from the pipes out.
Most Highland homes were built between the 1960s and the early 2000s, and the bathrooms show it. Original vanities, cultured marble tops, small tubs, and dated tile are everywhere. Newer builds in East Highland Ranch already have bigger footprints, but the finishes often feel builder-grade. Both types of home benefit from the same approach, a real look at what's behind the walls before we start picking out new stuff.
We start with a walk-through and a conversation. What bugs you about the current bath, what do you want the new one to feel like, and what is the realistic budget. From there we sketch a layout, help you pick tile and fixtures, and put together a written scope with a fixed price. There are no surprise change orders unless you actually change the scope. Everything is on the table before we start.
Because Grand Plumbing is a plumbing company first, the parts you don't see get done right. Drain slopes are set correctly, vents are added or extended if the code requires it, and supply lines get new shutoffs. Old galvanized in a 1970s Highland home gets swapped for PEX or copper while the wall is open. It's cheaper to do it now than to open the wall again in five years because a pipe finally gave out.
Then we build the finish work with the same care. Waterproofing under the tile, backer board where it belongs, and clean grout lines that don't crack. We also pull the permits Highland requires and schedule the inspector, so when you sell the house down the road, the paperwork is there. A good bath remodel should look great, work great, and still look great ten years later. That's the goal on every job.
READY TO REDO YOUR BATH? LET'S TALK.
Free in-home design consults in Highland, East Highland Ranch, and across the Inland Empire.
Featured Remodeling Services
More transformations we handle for homes across the Inland Empire.
Service Area
CITIES WE SERVE
Bathroom remodeling across Highland and every neighboring city in the Inland Empire.
FAQ.
Common questions on bathroom remodels in Highland. Don't see yours? Give us a call.
01How long does a bathroom remodel take?
How long does a bathroom remodel take?
A hall bath is usually 3 to 5 weeks from demo to finish. A primary bath with a bigger footprint or custom tile can run 5 to 8 weeks. We give you a real schedule up front.
02Do I need permits for a bathroom remodel in Highland?
Do I need permits for a bathroom remodel in Highland?
In most cases yes, especially if you're moving plumbing, changing electrical, or altering the layout. We pull the permits and schedule inspections as part of the job.
03Can you help with design and product selection?
Can you help with design and product selection?
Yes. We can walk you through tile, vanities, fixtures, and finishes, and we'll go to the showroom with you if you'd like. Most people find that part the most fun.
04How much does a bath remodel cost?
How much does a bath remodel cost?
A midrange hall bath in Highland typically runs between $18k and $30k depending on layout changes and finishes. Primary baths are higher. We give a written flat price after the walk-through.
05Will you replace old pipes while the walls are open?
Will you replace old pipes while the walls are open?
That's one of the biggest reasons to hire a plumbing company for your remodel. We upgrade shutoffs, replace old galvanized, and clean up vents while the drywall is already off.
06Do you handle everything or do I need to hire other trades?
Do you handle everything or do I need to hire other trades?
We handle it all. Demo, plumbing, tile, drywall, paint, electric, and finish are managed by our crew. You have one point of contact from start to finish.
ONE BATHROOM. YEARS OF EVERYDAY JOY.
Call us for a free design consultation. We'll walk your space, listen to what you want, and give you an honest number.
LIC #1082797 · Serving Highland, Redlands, Yucaipa, and the entire Inland Empire.






